Project recovery and operating readiness

Project recovery
and startup readiness

When a project has stalled or a facility is approaching startup, Sleipnir helps organize the remaining work. We connect equipment testing, operator preparation, unresolved issues and handover so the team can see what must happen next.

For asset owners, project sponsors and commissioning leaders managing open issues, incomplete testing or an operating team that needs to be ready for the new asset.

West Riverside / Inside the control room

01 / THE WORK

Know what remains.
Build a completion plan.

We establish what is preventing completion, the decisions it requires and the work needed for the operating team to accept the asset.

Review the current position

Examine scope, punch items, test records, contractor and vendor obligations, and the procedures and training needed for operation.

Set the recovery plan

Assign each open item, sequence the remaining work and identify the decisions, resources and evidence required for acceptance.

Coordinate completion and handover

Track the agreed work through testing, procedures, training, spares and documentation. Keep the owner and delivery team informed as issues are resolved.

What the engagement covers

The engagement can start with a readiness review and progress into recovery coordination or a defined delivery workstream. The scope identifies decision authority and the engineering, contractor, OEM and operating responsibilities involved.

02 / EXPERIENCE BEHIND THE OFFER

Experience behind
the service.

Tim designed the control room for a 730 MW new build and led whole-plant startup operations from late October 2019 through March 2020 during staged commissioning. He combined that work with leadership of the existing 630 MW plant and 212 MW peaking fleet, operator hiring, training and contractor coordination.

See the experience behind this service

03 / DEFINE THE FIRST OUTCOME

Discuss the project
you need to complete.

Tell us the project’s current stage, what is preventing progress and the startup or handover date you are working toward.

The first conversation establishes the current position, the work that would help and the scope for a proposal.

Discuss readiness & recovery(904) 435-6360 timothy@sleipnirsystems.net

Send a project inquiry

sleipnirsystems.net

Jacksonville / Northeast Florida
Field and remote delivery

Return to the service paths
Image sources

Dockside artwork follows U.S. Coast Guard photographs of Fure Ven at Talleyrand Marine Terminal, photographed by Joe Perez on September 1, 2020 (source photograph). The control-room artwork follows an interior photograph of West Riverside credited to HDR and published by POWER (source photograph). The LNG construction photograph is from the founder’s supplied project archive.