Skip to content
Founder-supplied photograph of LNG equipment installation at an operating facility
← All services

Power and fuel operating readiness

Power and fuel
operating readiness

Sleipnir helps project owners work through the fuel, equipment, storage, transport and operating requirements behind an energy project. We review the assumptions and identify the engineering, supply and site decisions needed to move forward.

For developers, generation providers and EPC teams preparing an operating plan or testing the supply and delivery assumptions behind a proposed project.

LNG / Equipment installation

01 / THE WORK

Connect demand,
supply and delivery.

The review brings the proposed equipment duty, fuel requirements, storage, transport and operating arrangements into a common planning basis.

Establish the operating requirements

Document expected demand, equipment duty, fuel specifications and the supply, storage and delivery arrangements the operation will require.

Review the practical constraints

Work through vendor scope, transport, site storage, receiving arrangements and the responsibilities connecting fuel supply to plant operation.

Define the next decision

Record the open issues, assumptions and next-stage engineering, specialist or permitting work needed to move the project forward.

What the engagement covers

The engagement provides an operating requirements record, a review of constraints and a recommended next-stage scope. Engineering studies, supplier commitments and permitting tasks are identified with their respective owners.

02 / EXPERIENCE BEHIND THE OFFER

Experience behind
the service.

Tim’s career spans conventional and renewable generation, LNG production and storage, receiving terminals, regasification and marine fuel delivery. His work has connected plant requirements to supply arrangements, customer implementation and construction.

See the experience behind this service

03 / DEFINE THE FIRST OUTCOME

Discuss the power
or fuel plan.

Tell us the proposed operation, its demand and equipment, and the supply or delivery assumptions that need to be tested.

The first conversation establishes the current position, the work that would help and the scope for a proposal.

Discuss a power & fuel scope(904) 435-6360 timothy@sleipnirsystems.net

Send a project inquiry

sleipnirsystems.net

Jacksonville / Northeast Florida
Field and remote delivery

Return to the service paths
Image sources

Dockside artwork follows U.S. Coast Guard photographs of Fure Ven at Talleyrand Marine Terminal, photographed by Joe Perez on September 1, 2020 (source photograph). The control-room artwork follows an interior photograph of West Riverside credited to HDR and published by POWER (source photograph). The LNG construction photograph is from the founder’s supplied project archive.

EXPLORE SLEIPNIR